Pipeline
Development Target: 10 GW in 5 Years
Powered Land and Industrial Compute Capacity in Development
WDC is developing a portfolio of industrial compute sites across North America – from regional developments to gigawatt-scale, connected AI campuses. We are working toward a development target of 10 GW in five years.
Qualification Criteria
Grid Availability
6-cent or less power to qualify utility profiles
Minimum Scalability
100 MW+ scalability with defined interconnection path
Hybrid Expansibility
Expansion through onsite or adjacent hybrid (solar, wind, gas) generation
Entitled Readiness
Clear entitlement path and development feasibility
Active Opportunities (In Contract / Negotiation)
A high-level view of our priority sites in key strategic hubs, developed for immediate industrial scaling.
| TEXAS SITES UNDER CONTRACT | WEST TEXAS I | DALLAS I | DALLAS II (AUSTIN) |
|---|---|---|---|
| Design Total Capacity (May Expand) | 1,300 MW | 1,300 MW | 1,700 MW |
| First Grid Power | 400 MW @ ≈36 Months | 400 MW @ ≈48 Months | 800 MW @ ≈48 Months |
| First Gas Power | 800 MW @ 12–18 Months from NTP | 800 MW @ 12–18 Months from NTP | 800 MW @ 12–18 Months from NTP |
| First Nuclear Power | 100 MW @ 36–48 Months from NTP | 100 MW @ 36–48 Months from NTP | 100 MW @ 36–48 Months from NTP |
| Expected Min Site Power < 18 Months | 250–400 MW | 250–400 MW | 250–400 MW |
| Expected Min Site Power < 24 Months | 650–800 MW | 650–800 MW | 650–800 MW |
| Expected Min Site Power < 36 Months | 1,300 MW | 1,300 MW | 1,700 MW |
| Grid Power | |||
| Grid Voltage Tie-in(s) | 1x138, 1x345 | 2x138, 345 | 1x345 |
| Historical Energy LMP $/MWh | 35$/MWh | 35$/MWh | 35$/MWh |
| Gas | |||
| Non-attainment Zone | No | No | No |
| Pipeline Diameter | 42" | Multi 42" | TBD |
| Distance to Site | <2 mi | <5 mi | <3 mi |
| Fiber | |||
| Carrier | Lumen ++ (Multi) | Lumen ++ (Multi) | TBD |
| Land | |||
| Land Size | 600+ Acres | 250+ Acres | 600+ Acres |
| Land Jurisdiction | Unincorporated | Unincorporated | Unincorporated |
I74 Wired Business Campus
Total area
65,000 sq ft
Office, data center, and supporting infrastructure
Power
2 MW
Telecom-grade infrastructure with backup systems
Location
Cincinnati, OH
2300 Montana Avenue • Near I-74 corridor
Investment summary
The i74 Wired campus offers a rare combination of institutional-grade data center infrastructure and flexible office space, positioned in a strategic Cincinnati location. The property is suited for investors seeking a stabilized, mission-critical asset with long-term potential for value creation.
Key highlights include backup power systems, fiber connectivity, and a co-working component that supports a diverse tenant base. The campus benefits from proximity to major transportation corridors and a growing regional technology hub.
Key features
- Backup generators and redundant power systems
- Fiber connectivity and telecom-grade infrastructure
- Co-working space and flexible office configurations
- Proximity to Interstate 74 and regional logistics routes
Qualifying Opportunities (Typical)
Requesting Detailed Information
Site-level details – location, power studies, interconnection status, entitlement, and commercial terms –
are available to qualified parties under NDA.
The Access Process
Submit Request
Identify your organization and interest (occupier, land/energy owner, or development partner).
WDC Qualification
WDC internal team performs qualification reviews to verify partner alignment.
NDA Execution
Execution of mutual Non-Disclosure Agreement protects sensitive infrastructure data.
Data Room Access
Access the confidential project data room detailing exact engineering, timelines, and terms.
Request Pipeline Access
Have a Site?
WDC provides 100% of forward development costs for qualifying power and land opportunities.
Land and energy owners: start with the PREP Program