Colocation & Data Centers for Sale

Tel : 415.670.9734 - - Click Here to Email WiredRE or Request a Custom Quote

Limestone Mine Property for Data Center Development
Kentucky/Cincinnati Limestone Mine Data Center Land

Status:

Available for sale.

Class:

Greenfield.

Rate:

Negotiable.

Avail:

2.6 million square feet with 32' wide aisles, 27' clear height.

Map:

Kentucky Limestone Mine Data Center

Power:

10 MW available from AEP.

PUE:

54°F - 56°F year-round.

Network:

Windstream.

Now available, Mega Mountain’s huge, 60 acre unique interior space is the result of years of uniform mining of limestone. Its open space consists of long crisscross aisles approximately 32’ wide and 27’ high from the level stone floor to the level stone ceiling. These aisles crisscross each other in a checker board grid pattern particularly suitable for a data center facility. The exterior plateau, at mine floor entry level, is large enough for buildings and needed parking. There are presently four new foundations with partial cement block walls started on the plateau. The site includes 80 interior acres (2.6 million square feet) and 186 exterior acres.

Area aerial photo.

Aerial photo.

Aerial photo.

Previous data center project construction photo.

Previous construction photo.

Previous construction photo.

Previous data center project construction photo.

Previous construction photo.

Previous construction photo.

 

Download Property Flyer »

Nevada Data Center Development for Sale
Winnemucca, Nevada Data Center Land

Status:

Greenfield

Class:

Rate:

Negotiable

Avail:

22,000 acre

Map:

Winnemucca, Nevada Data Center for Sale

Power:

150 MW with current transmission infrastructure

PUE:

Low, options for sustainable power

Network:

AT&T is the local exchange carrier; Verizon, Century Link, and Sprint are long haul carrier options

This 22,000 acre Winnemucca data center site features natural resources, sustainable energy options, a low risk profile, security, and access to power, fiber, and water. Remote locations like this site in Nevada offers key incentives; competitive land costs, reduced construction costs, and tax incentives.

Beyond being outside of natural disaster risk areas the site is ideal for solar power capable of supporting a utility scale project and generating 6 kWh per square meter per day. The site also provides proximity to the proven markets of Silicon Valley, Las Vegas, and Reno.

State of the Solar Industry: 10 Stats to Know

 

San Francisco Data Center
San Francisco California Data Center

Status:

Near term occupancy.

Class:

Tier III design, 2N, N+1.

Rate:

Negotiable.

Avail:

128,000 SF, 32,000 SF per floor, 13-15 foot clear ceiling heights, 250 lb/sf floor loading.

Map:

San Francisco Data Center

Power:

Up to 16 MW available from PGE.

PUE:

1.16 to 1.35 design estimate.

Network:

XO, Level 3, Synesys, CenturyLink, Integra, Zayo, and others within 500 feet. Less than one mile from 200 Paul.

1828 Egbert Avenue is an exceptional 4-story data center shell property strategically located directly on the Bay Area fiber ring and less than one mile from 200 Paul. The building is reinforced concrete with seismic performance substantially above California Essential Facility standard for critical facilities with a seismic importance rating of 1.5.The facility currently has 10MW switch gear installed, up to 16MW available from PGE. Site plans developed with entitlements available and in process. The property is one a block from Hwy 101 near the Hwy 280 interchange providing ease of travel access.

Interior.

San Francisco Data Center Egbert

San Francisco Data Center Egbert

Fiber Availability.

San Francisco Data Center Egbert

San Francisco Data Center Egbert

Download Property Flyer »

Chicago Data Center For Sale / Lease
Chicago Illinois Data Center for Lease

Status:

Immediate Occupancy

Class:

Tier III

Rate:

Negotiable

Avail:

20,000 Sq. Ft.

Map:

Power:

7 cents (Underground Fed)

PUE:

1.5

Network:

One of the most networked sites in Chicago - fiber, lit or dark, or conduit to any location included with lease.

  • Full turney + available raw space.
  • 12 MW Utility Power; 6MW available with capacity to add 6MW.
  • Support infrastructure in place.
  • 24 x 7 Building Security.
↑ Return to top