Atlantic Edge 30+ MW Industrial Compute
Home / ATLANTIC EDGE 30+ MW Industrial Compute
Value Proposition
Cloud Connected ‘Edge’ Location – ‘Atlantic Silicon Edge’
- Duke, 30MW, Industrial Scale, Utility Capacity (Avail Now, Dual Subsations)
- Scalable to 130+ MW w/ Utility-Financed Upgrades (Zero Cost)
- Low-Cost Power (Approx $0.06) in Established Market (Google, FB, Apple)
- On-net w/ Multiple Fiber Providers – Dark or Multiple 100G Connections
- Proximity to Massive Market – Atlantic Silicon Edge
- Over 55% Non-Carbon-Based Power, 30% Nat Gas
- Trade Zone / Tax Advantages